RESPA date guide

Extension-notice dates

The calculator accepts the request classification selected by its user. It does not classify a request or decide whether a rule applies to an individual loan.

Baseline and optional extension

The calculator keeps the baseline response date separate from the optional extended date. It shows an extended date when you select Yes for timely written extension notice received and the configured rule has an extension period for your selected classification.

It does not decide whether the notice was timely or sufficient, or whether an extension applies to a specific loan. Keep the notice with your own records.

Sample calculations

Sample only: these worked dates illustrate the configured calculator with the inputs shown. This is not an output or a determination about a real request.

Timely written extension notice received: Yes in both samples. Source: configured rule below.
Selected classificationReceipt-date inputOptional extended date
Notice of Error / Standard notice of error
Request for Information / Standard request for information

The configured arithmetic excludes Saturdays, Sundays, and configured legal public holidays. The optional extension is counted from the baseline response date, using the selected classification.

Configured source

12 CFR §§ 1024.35(d)-(e), 1024.36(c)-(d) · source year 2026 · eCFR source

ServicerIQ is software, not a law firm, and is not a substitute for advice from a licensed attorney. Figures show public data with source and year; they describe populations, not your loan.